Ⅰ.urpose:
The organic tin is usually dibutyl lauryl tin. The addition of organic tin has a significant effect on the thermal stability of the resin and can improve the whiteness and gloss of the PVC resin products. However, the organic tin has the disadvantage of aggravating the stickiness of the pot.
Ⅱ.Quality Indicators:
Appearance: A light yellow, transparent, oily liquid
Selenium content (%): ≥18
specific gravity: 0.97~0.98
Ⅲ. Usage:
Users can choose to use it according to the actual situation, and can be added in the early and late stages of the reaction. The
dosage is 0.1~0.2kg (per 1000kg PVC).
IV. Packaging and Storage:
1. This product is packaged in 200kg galvanized drums. Custom packaging is available upon request.
2. Avoid collisions, upside-down placement, and direct exposure to heat or rain. Store in a cool, dry, and well-ventilated
warehouse.
3. Under the specified storage and transportation conditions, the product shall remain valid for one year from the date of
production.
FAQ:
1. Are you manufacturer or trading company?
We are a manufacturer and establised in 2003.
2 What is the delivery time?
Usually about 7-15 days, it depends on quantity and products.
3.What are your payment terms?
T/T, L/C,D/P..... can be negotiated.
4. Does your company provide samples?
we can provide a small quantity of free samples, but buyer needs to bear the delivery costs.
Payment Terms & Shipping
This street light features high brightness, energy saving, environmental protection, and easy installation. It has a waterproof rating of IP67 and has passed CE certification. It is suitable for schools, parks, roadsides, factories, squares, etc. It has a warranty period of 3 years. Moreover, we can provide various styles to meet your needs.

| Shipping time by Sea (Just for reference) |
| North America | 11~30 days | North Africa | 20~40 days | Europe | 22~45 days | South-east Asia | 7~10 days |
| South America | 25~35 days | West Africa | 30~60 days | Middle East | 15~30 days | East Asia | 2~3 days |
| Middle America | 20~35 days | Eest Africa | 23~30 days | Ocenia | 15~20 days | South Asia | 10~25 days |